28) Interior Work - December '17
With outside work nearly complete it was time to look to the inside. To take the chill off it was decided to bring in a propane heater:
Besides making it comfortable enough to work without gloves, the interior had to be heated to allow for proper curing of the main floor concrete slab. Here's the radiant tube layout:
The concrete crew toweling out the 4 inch slab:
Here's the same floor solid, dry and able to be worked on.
View of the internal staircases.
The mudroom:
Looking down the staircase:
View of the unfinished bathroom:
Top floor family room:
Bottom floor. View of the internal doors that separate the main house from the hot tub room:
Looking over the green roof:
Meanwhile back at home, I added a layer of concrete to beef up the bottle wall. It's going to be a challenge to move these babies into place come spring!